This project consists of grading, drainage, base, paving, walls, and construction of a 1-span, 113-foot long precast, prestressed concrete deck bulb-tee girder bridge. Abutments are founded on spread footings. The work also includes construction of a temporary detour bridge and demolition of the existing steel truss bridge.