State Highway Projects in Polk County

Project  Description Location Schedule Cost Link

Curve Warning Signs 
(Watch Informational video here)

update curve warnings signs to current standards and add curve warning signs, as needed, based on crash history. Region 2: Willamette Vallet and NW Oregon

Construction in
2021-2022

$11.3 M View
Details
OR 22 & OR 51 Intersection Safety Improvements Explore safety improvement options. OR22 & OR51 Intersection Design: 2019 - 2023 Design $8M, construction phase not funded. View Details
OR 18: Fort Hill Road to AR Ford Road Study and recommend a design plan to improve safety and reduce congestion on OR 18 and OR 22.  OR 18 between mileposts 22 and 24, and  OR 22 from milepost 23.1. Facility plan through summer 2021. Remaining scheduled TBD. Design: $4.5M View Details
OR 18: Pedestrian Crossing Enhancements Enhancements at existing pedestrian crossings in Grand Ronde​ Intersection of OR18 and Grand Ronde Road, milepost 21.2

Design: Dec 2020
Construction: 2022

$666,200 View Details
OR 22: Doaks Ferry Road to Riggs Avenue Project to improve safety by changing access onto OR 22 at Doaks Ferry Road. OR 22 from Doaks Ferry Road to Riggs Avenue

Design: 2019-2022
Construction: 2023

Design & Construction: $657,227 View Details
OR 22: Perrydale Rd. to Kings Valley Hwy Make safety improvements on OR 22 at the Perrydale Road intersection and Kings Valley Highway/Smithfield Road intersection.​​ OR 22 at ​Kings Valley Highway and Perrydale Road

Design: 22-24
Construction: 24-26​

​​Design & Construction: $11,433,800 View Details
OR 221: Michigan City Lane to Edgewater Street  Series of improvements on OR 221 (Wallace Road) in West Salem.  OR 221: Michigan City Lane to Edgewater Street 

Design: 2018-2020
Construction: 2021-2022

Estimated $9.9M View Details
OR 99W: Orrs Corner Rd. to Clow Corner Rd. Construct road improvements to address safety and crash history problems: 

1. Constructing a northbound left turn lane at the intersection of OR 99W and Orrs Corner Rd.
2. Constructing a modern roundabout at the intersection of OR 99W and Clow Corner Rd.
3. Reconnecting the multiuse path on the west side of OR 99W, including ADA ramps.

​OR 99W between Orrs Corner and Clow Corner Roads Design through 2022.
Construction will occur over  multiple years beginning in 2023.
 
​$10.5 million View Details
OR 22: Westbound Marion St. Bridge Replacing the bridge surface to improve the smoothness and reduce maintenance costs.​ OR 22:  Marion St. Bridge

​Design: 2021 - 2022
Construction: 2022

Design & Construction: $6,950,306 View
Details